|
The Idukki Dam, located in Kerala, India, is a tall arch dam. The dam stands between the two mountains - ''Kuravanmala'' (839)m and ''Kurathimala'' (925) m. It was constructed and is owned by the Kerala State Electricity Board. It supports a 780 MW hydroelectric power station in Moolamattom. It is built on the Periyar River, in the ravine between the ''Kuravan'' and ''Kurathi'' Hills in Kerala, India. At 167.68 metres, it is one of the highest arch dams in Asia and third tallest arch dam. It started generating power on 4 October 1975.〔(【引用サイトリンク】 title = Idukki District Hydroelectric projects )〕 Technically, the dam type is a concrete double, curvature parabolic, thin arc dam.〔(【引用サイトリンク】 title = Salient Features - Dam )〕 This dam was constructed along with two other dams at Cheruthoni and Kulamavu. Together, the three dams have created an artificial lake that is 60 km² in area. The stored water is used to produce electricity at the Moolamattom Power house, which is located inside nearby rocky caves. The Government of Canada aided in the building of the dam with long term loans and grants.〔 ==History== The idea of constructing a dam for power generation was first conceived in 1919. As per history, Shri Kolumban, the head of 'OOrali' race during 1922, showed the way to the Malankara Estate Superintendent and his friend AC Thomas Edattu, who were on hunting spree in the forest, the spot of present Arch Dam. He told them of the legend of Kuravan and Kurathi Hills. Mr. Thomas was impressed by the sight of water flow between the mountains and it was his idea that has materialized in the form of Idukki Arch Dam. Sri. W.J.John of Malankara Estate submitted a report to the Government of Travancore in 1932 on the possibility of constructing a dam at Idukki for Power Generation.〔(Idukki )〕 In 1947, a preliminary investigation report was prepared and submitted by Sri. P. Joseph John, the then Chief Electrical Engineer to the Government of Travancore. It was during 1956 that the Central Water Commission conducted a detailed investigation based on the Government's request. The project report was prepared in 1961 and the Planning Commission accorded sanction for implementing the scheme in 1963 and the preliminary works of the project were started. The construction of this Dam commenced on 30 April 1969. Storage of water in Idukki reservoir commenced in February, 1973. The inauguration of trial run of the first machine was celebrated on 4 October 1975. Commercial operation of the Power Station was Commissioned on 12 February 1976 by the then Hon. Prime Minister Smt. Indira Gandhi. The Government of Canada aided the Project with long term loans and grants. M/s S.N.C.Inc., Canada, a well-known firm of Consulting Engineers were advising and assisting Project Engineers under Canadian aid. Construction of this Arch Dam and two other dams at Cheruthony and Kulamavu has created an artificial lake of 60 km2 width and the water stored is utilized for production of electricity at the unique Moolamattom Power house, which is located inside the rocky caves. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Idukki Dam」の詳細全文を読む スポンサード リンク
|